Waterfall Way reseal rectification works

Date: 14 November - 21 November

Bitumen re-seal works were previously undertaken along various segments of Waterfall Way in 2022. It has been identified that rectification works are required to remedy work previously undertaken by external contractors.

A reseal involves the application of new aggregate to the road surface. This results in some loose material being present on the surface for a period of a few weeks while the surface settles and the aggregate achieves embedment. A street sweeper will return to the urban reseal sites after this period to remove any remaining loose stone. Rural locations may require a tractor mounted broom to remove remaining loose stone.

Short delays are to be expected along the various segments along Waterfall Way. Motorists are asked to take care following new reseal work due to the changed traffic conditions.

Traffic control will be in place once work commences.


  • Culvert an guardrail repairs west of Dorrigo
  • Permanent repair work to Myers Bluff and Thora landslides
  • Safety improvements between Wills Creek and Bundarryuron